This is a safety improvement project.   

An intersection control evaluation analyzed several alternatives to improve safety and operations at the intersection. This included two roundabout alternatives, two alternatives that provided a cul-de-sac at WIS 60 and improved the intersection of US 51 and WIS 22, and one alternative that provided a cul-de-sac at WIS 22 and improved the intersection of WIS 60 and US 51. In addition to these alternatives, traffic signals were also evaluated.

The evaluation and feedback received at the public involvement meeting held December 15, 2015, indicated that the roundabout alternative at WIS 60 and WIS 22 was the preferred alternative. The proposed design reduces the number of intersections from three to one, providing safer operations to motorists and reducing congestion at the intersection. The design was subsequently approved for Highway Safety Improvement Program (HSIP) funding.

Frequently asked questions (FAQ)

Schedule

Scheduled/future

  • Summer 2022 - Construction anticipated

Past (prior to today)

Traffic impacts/detours

The proposed roundabout will be constructed with traffic on WIS 22 and WIS 60 detoured. US 51 for the majority of the project will remain open. More information on this project will be provided as the design process continues.

Status/phase

Design

Contact information

Lalitha Balachandran, WisDOT Project Manager
(608) 243-3382
lalitha.balachandran@dot.wi.gov

Michael Bie, WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email: swr.dtsd@dot.wi.gov