WIS 28/WIS 67 Reconstruction

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

​WIS 28/WIS 67, City of Mayville, Dodge County 

Project overview

The project includes reconstructing 0.29 miles of WIS 67 (Main Street) from Ruedebusch Avenue to WIS 28 (Horicon Street) and 0.63 miles of WIS 28 (Horicon Street) from Clark Street to WIS 67 (Main Street).

WIS 67 (Main Street) Overview:

  • Reconstruct WIS 67 (Main Street) in the City of Mayville from Ruedebusch Avenue to WIS 28 (Horicon Street) (Approx. 0.29 Miles). Reconstruction will include removing and replacing the existing pavement, base course layer, sub-base course layer, curb and gutter, storm sewer, sidewalk, pavement marking, permanent signing, and re-painting existing street lighting. In addition, two sections of beam guard will be replaced on WIS 67 just south of the Mayville city limits. The City of Mayville will also be replacing the sanitary sewer and water lines in conjunction with this project.
  • The proposed roadway typical section along the west side of WIS 67 will consist of: 12-foot travel lane, a 5-foot bike lane, a 6-foot parking lane, a 30-inch curb and gutter with a 5-foot terrace width and a 5-foot sidewalk. The proposed finished typical section along the east side of WIS 67 will consist of: a 12-foot travel lane, a 4-foot bike lane, an 18-inch curb and gutter with a varying terrace and an 8-foot pedestrian path. The intersection of WIS 67/WIS 28 will also be improved to accommodate large truck turning movements.

WIS 28 (Horicon Street) Overview:

  • Reconstruct WIS 28 (Horicon Street) in the City of Mayville from Clark Street to WIS 67 (Main Street) (Approx. 0.63 Miles). Reconstruction will include removing and replacing the existing pavement, base course layer, sub-base course layer, curb and gutter, storm sewer, sidewalk, pavement marking, permanent signing, and re-painting existing street lighting. In addition, two sections of beam guard will be replaced on WIS 67 just south of the Mayville city limits. The City of Mayville will also be replacing the sanitary sewer and water lines in conjunction with this project.
  • The proposed roadway typical section on WIS 28 will consist of: 44-foot roadway with two 12-foot travel lanes, varying sides for parking, a bike lane (vary to accommodate parking), 5-foot sidewalks, and 30-inch curb and gutter with generally a five-foot terrace width.

Schedule

Construction currently scheduled for 2018

  • January 9, 2018 - Letting
  • March - August - WIS 28 construction
    • Reconstruction work will occur between Clark Street and Main Street.
  • July – October – WIS 67 construction
    • Reconstruction work will occur between Ruedebusch Street and Horicon Street.

Traffic impacts/detours

  • WIS 67 (Main Street) will be closed to through traffic during construction. Through traffic will be detoured using WIS 33 to WIS 28. 
  • WIS 28 (Horicon Street) will be closed to traffic during construction. Through traffic will be detoured using WIS 33 to WIS 67.
  • WIS 67 and WIS 28 will both be closed to through traffic during construction of the intersection of WIS 67/WIS 28. This closure is expected to be limited to approximately one month. Through traffic will be detoured using WIS 33 and County P.
  • Access to residents and businesses on Main Street and Horicon Street will be maintained for local traffic at most times. Businesses are encouraged to review WisDOT’s “In This Together” Program for guidance and best practices for guiding customers to businesses during construction.

Status/phase

Design

Contact information

Jeremy M. Hall, P.E, WisDOT Project Manager
(608) 245-2655
jeremy.hall@dot.wi.gov

Michael Bie, WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email: swr.dtsd@dot.wi.gov