US 51/US 2 Intersection, Iron County

Location

US 51 and US 2 Intersection, Iron County

Overview

The project includes removing the existing US 51 Overhead Structure and replacing the interchange with a single lane roundabout with bypass lanes.

Traffic Impacts

Construction of the proposed roundabout is planned to be completed in four stages:

Stage 1: A temporary US 51 roadway would be constructed to the west of the existing US 51 alignment, resulting in a temporary T-intersection to the west of the existing overpass of US 2. 

Stage 2: Work zones would be located east and west of the interchange along US 2 for the construction of temporary crossovers.  Work zones would also be located along the WB lanes and north side of US 2 for the removal of the north half of the existing structure, the NB US 51 to WB US 2 ramp, and the WB US 2 to SB US 51 ramp.  The future WB US 2 bypass lane would be constructed.

Stage 3: Construction would be located along the EB lanes and south side of US 2 to remove the south half of the existing structure, the NB US 51 to WB US 2 ramp, and the NB US 51 to EB US 2 ramp.  Roundabout construction would be completed.

Stage 4: Construction would include the remaining segments of US 51 and the removal of the temporary US 51 roadway.

Schedule

Public input received by: March 12, 2020

Complete environmental document: March/April 2020

Complete design: Summer/Fall 2020

Construction currently scheduled: Spring/Summer 2021

​Contacts

WisDOT Project Manager:

Dan Erva, 715-365-5776

Daniel.Erva@dot.wi.gov

WisDOT Region Communication Manager:

Tegan Griffith, 715-493-3710

Tegan.Griffith@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
North Central Region, Wisconsin Rapids Office
510 Hanson Lake Road
Rhinelander, WI 54501
Phone: (715) 365-3490
Fax: (715) 365-5780
TTY: 711
Email: ncr.dtsd@dot.wi.gov