WIS 20 Rehabilitation (90th St. to Oakes Rd.) – Racine County

Project Location

​WIS 20, ​between 90th Street and Oakes Road in Racine County.

​​Project Overview​

This project begins about 800 feet east of 90th Street and ends about 600 feet west of Oakes Road in Racine County, about 4 miles east of I-94.​ The proposed mill and overlay work will address deteriorating conditions​ along WIS 20, as well as rehabilitate 4 bridges along WIS 20 that go over Willow Road and the Union Pacific Rail Road (UPRR). Improvements will include:

  • Overlays on bridges carrying WIS 20 over Willow Road and UPRR
  • Patching and resurfacing pavement
  • Beam guard replacement

Overview

Schedule​

​Construction is currently scheduled for 2023. It is anticipated to begin in the spring and be completed by the fall.​

​Traffic Impacts

WIS 20 will remain open to traffic during construction. Traffic on WIS 20 will be staged with one lane closed at a time in each direction so the other lane can be worked on. Ramp detours will be in place for the time periods when the entrance/exit ramps from/to Willow Road are closed. It is anticipated that the ramp traffic will be detoured to Oakes Road. The proposed traffic control is preliminary and subject to change.​

Contacts

Gary Metzer, WisDOT Project Manager
Gary.Metzer@dot.wi.gov 
(262) 548-5685

Dan Sellers, WisDOT Communications
Daniel.Sellers@dot.wi.gov
(262) 548-6702