WIS 106 (County CI to First Street)

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

WIS 106 (County CI to First Street), between Fort Atkinson and Palmyra - Jefferson County

Project overview

The project will address 4.9 miles of deteriorated pavement on WIS 106 between County CI and First Street. This project will pulverize the existing asphaltic pavement and overlay with 3.5-inches of asphalt pavement.

Additional improvements will include:

  • 3-feet of existing gravel shoulder will be paved. Overall shoulder width will be reduced from 6-feet to 5-feet. This shoulder width will be reduced to eliminate grading beyond the existing shoulder due to profile of roadway being raised with overlay approximately 2-inches.
  • The guardrail and end terminals adjacent to Mud Creek and the Scuppernong River will be replaced
  • Some existing culvert pipes will be replaced during this project
  • Installation of centerline rumble strips
  • Installation of asphalt safety edge on the outside paved shoulders
  • Installation of pavement marking

Schedule

  • Summer 2022 - Construction anticipated

Traffic impacts/detours

WIS 106 will be closed to through traffic during construction and detoured. Flagging operations will be used for local traffic.

Status/phase

Design

Contact information

Jeremy M. Hall, P.E, WisDOT Project Manager
(608) 245-2655
jeremy.hall@dot.wi.gov

Michael Bie, WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email: swr.dtsd@dot.wi.gov