WIS 130 bridge over Wisconsin River (2020 Maintenance), Lone Rock

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

WIS 130 bridge over Wisconsin River (2020 Maintenance), Lone Rock - Iowa/Richland/Sauk counties

Project overview

This is a heavy maintenance project on the existing steel truss bridge structures of WIS 130 crossing the Wisconsin River. The purpose of the maintenance is to preserve the serviceability and the existing mobility of traffic across the bridges until the completion of the proposed replacement structures at this location in 2028.

Improvements include:

  • Repair of structural steel elements
  • Spot cleaning and painting
  • Substructure repairs (including concrete repair of abutments and replacement of bearings)
  • Repair of floorbeam/stringer connections
Load limits in place at the start of maintenance construction will remain in place until the completion of the proposed replacement structures.

Schedule

  • April to September 2020 - Construction anticipated

Traffic impacts/detours

The Wisconsin River crossing of WIS 130 will be closed to through traffic for the duration of construction.

  • Detour for eastbound WIS 130
    • Use US 14/WIS 23
    • Cross Wisconsin River in Spring Green
  • Detour for westbound WIS 130
    • Use US 14, WIS 60, WIS 80, WIS 133
    • Cross Wisconsin River in Muscoda
  • Detour Map

Status/phase

Design

Contact information

Daniel Kleinertz, P.E., WisDOT Project Manager
(608) 789-5709
daniel.kleinertz@dot.wi.gov

Michael Bie, WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
Fax: (608) 785-9969
TTY: 711
Email: swr.dtsd@dot.wi.gov