WIS 33 (WIS 23 to US 12), Reedsburg to Baraboo - Sauk County

Construction will take place at the same time as this project: WIS 23 (Copper Springs Rd. to North Junction WIS 33), Reedsburg to Wisconsin Dells

Project overview

The roadway surface is aged and deteriorated with cracking and rutting. A 6.5-inch overlay was placed in 2001. Roundabouts were constructed at the US 12 ramp terminals in 2010. Treatment is needed to extend the pavement service life.

Additional improvements include:

  • Repair pavement by treating the pavement with a mill and overlay
  • Mill and overlay work will include the US 12 ramp terminal roundabout
  • Installation of pavement rumble strips
  • No structure work is included in the project

Schedule

  • 2021 - Construction anticipated

Traffic impacts/detours

WIS 33 will be closed and detoured during construction.

Status/phase

Design

Contact information

Brad Schultz, P.E., Project Manager
(608) 242-8038
brad.schultz@dot.wi.gov

Michael Bie, WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
Fax: (608) 785-9969
TTY: 711
Email: swr.dtsd@dot.wi.gov