US 10, Portage County Line and Anderson Road, Waupaca County

Location

US 10, Portage County Line and Andersen Road, Waupaca Count​y

Project Overview

This project proposes to repair the failing concrete joint and slabs. Additional needs identified include guardrail and curb ramps that need to be updated, replacement and widening of the asphalt shoulders, and culvert repairs. The proposed work will include concrete joint repairs, spot concrete pavement replacement, the replacing and widening the HMA shoulders, culvert repairs, and replacing substandard curb ramps and guardrail to current standards.

Traffic Impacts

​Motorists will encounter single lane closures on US 10. Off ramps will have temporary closures as needed. Side roads at the interchanges will have lane and shoulder closures.

Real Estate

No Real Estate acquisition is anticipated.

Schedule

  • Local Officials Meeting: February 2024
  • Public Involvement: May 2024 
  • Design Study Report: May 2024
  • Finalized Design: August 2025
  • Construction currently scheduled to begin Summer 2026 at the earliest, or Summer 2028.​​

Public Involvement

Letters have been mailed to affected property owners. Below is a project location map and details on the traffic control methods that will be used on the project. 

Contacts

Korey Boehm, Project Manager
korey.boehm@dot.wi.gov
715-365-5764

Rhinelander Office
510 N. Hanson Lake Rd.
Rhinelander, WI 54501
(715) 365-3490
WI Telecommunications Relay System (TTY): 711
Fax: (715) 365-5780
ncr.dtsd@dot.wi.gov

Wisconsin Rapids Office
1681 2nd Ave. S.
Wisconsin Rapids, WI 54495
(715) 421-8302
WI Telecommunications Relay System (TTY): 711
Fax: (715) 423-0334
ncr.dtsd@dot.wi.gov