PROJECT UPDATE!
Project location
Three culverts located under US 151 in Fond du Lac County between Winnebago Park Road and Winnebago Heights Road.
Project need
The purpose of the project is to replace three deteriorated and structurally deficient culvert crossings.
Project improvements
This project will replace four culverts in the project limits.
- Culvert Crossing 0.75 miles from Winnebago Park Road
- The existing culvert crossing consists of one corrugated metal pipe culvert. This pipe is approximately 74 feet long. The project will replace the deteriorated pipe with a new concrete pipe culvert.
- View project display
- Culvert Crossing 1.21 miles from Winnebago Park Road
- The existing culvert crossing consists of two corrugated metal pipe culverts with beamguard on each side of the roadway. Both pipes are approximately 102 feet long. The project will replace the two deteriorated corrugated metal pipes with two 84” concrete pipe culverts and extend the pipes and slopes to eliminate the need for beamguard.
- View project display
- Culvert Crossing 1.44 miles from Winnebago Park Road
- The existing culvert crossing consists of one corrugated metal pipe culvert. This pipe is approximately 127 feet long. The proposed project will replace the deteriorated corrugated metal pipe with a new concrete pipe culvert.
- View project display
- *NEW* Culvert Crossing at Highland Park Road
- The existing culvert crossing consists of one corrugated metal pipe culvert. The project will replace the deteriorated corrugated metal pipe with a new concrete pipe culvert.
- View project display
Schedule *UPDATED Feb. 22, 2022*
- The project construction year has been advanced from 2023 to 2022.
Traffic impacts
US 151 will be closed and detoured during construction.
Temporary Business Signing
During construction temporary signing for business will be available for businesses within the detoured portion of the highway. Information on temporary business signing can be found on WisDOT’s ‘In This Together’ Guide for Businesses website.
Property impacts
Right-of-way acquisitions have been completed for this project.
Contacts
Kimberly Slezak, P.E.
Project Manager
WisDOT NE Region
944 Vanderperren Way
Green Bay, WI 54304
Phone: (920) 492-4131
Email: Kimberly.slezak@dot.wi.gov
Mark Kantola
Project Communications Manager
WisDOT NE Region
944 Vanderperren Way
Green Bay, WI 54304
Phone: (920) 492-4153
Email: mark.kantola@dot.wi.gov