Built in 1973, the bridge is in need of maintenance. The Wisconsin Department of Transportation is proposing to:

  • Mill and overlay the concrete bridge deck.
  • Replace the structure's wing walls.
  • Install a pipe underdrain system behind the abutments
  • Stabilize the abutment slopes
  • Make concrete repairs to the bridge parapet
  • Replace the structure's concrete approach slabs, surface drains, asphalt road approaches and guardrail

Schedule

Construction currently is scheduled for 2029, but work could occur in 2028 if funding becomes available.

Traffic Impacts

US 8 will remain open to traffic throughout construction, but traffic will be restricted to a single lane on the bridge controlled by temporary traffic signals.

Contacts

Matt Becklin
WisDOT Northwest Region Project Leader
(715) 635-5013
matthew.becklin@dot.wi.gov

Beth Cunningham
WisDOT Northwest Region Project Manager
(715) 635-4973
beth.cunningham@dot.wi.gov

Tou Yang
WisDOT Northwest Region Project Supervisor
(715) 833-5570
tou.yang@dot.wi.gov

Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Northwest Region, Spooner Office
W7102 Green Valley Road
Spooner, WI 64801
(715) 635-2184
WI Telecommunications Relay System (TTY): 711
nwr.dtsd@dot.wi.gov