This project will make improvements to approximately 9.5 miles of the I-43 Rock Freeway, between Bowers Road and WIS 83, in Walworth and Waukesha Counties. This project will be split into two segments:

Segment 1: Bowers Road to WIS 20 (red on map)

Segment 2: WIS 20 to WIS 83 (blue on map)

Proposed Improvements

Bowers Road to WIS 20:

  • Pavement replacement, including interchange service ramps at Bowers Road and WIS 120
  • Structure improvements to bridges and retaining walls along the corridor
  • Replace guardrail
  • Culvert pipe repair/replacement and cleaning
  • Replace existing signing and pavement marking
  • Drainage improvements

WIS 20 to WIS 83:

  • Pavement replacement, including interchange service ramps at WIS 20 and the southern half of WIS 83 (6 total ramps).
  • Structure improvements to several bridges along the corridor
  • Construction of dual left turn lane at southbound I-43 ramp to WIS 83
  • Culvert pipe repair/replacement and cleaning
  • Replace guardrail
  • Curb ramp replacement at WIS 83 ramp
  • Signal improvements at the I-43 and WIS 83 interchange
  • Replace existing signing and pavement marking

Public Involvement

WisDOT hosted a public involvement meeting on November 21, 2024 at the East Troy Village Hall to discuss the proposed improvements. Materials and exhibits shared at the meeting are posted below.

As the project continues to move forward, your input is welcomed and appreciated throughout the design process.

Traffic Impacts

I-43 will remain open with staged construction. Crossovers will be used to maintain flow of traffic along I-43. Temporary ramp closures will be needed to accommodate ramp construction. Any ramp closures will include posted detours.

Schedule

Construction is tentatively scheduled to begin in fall 2026.

Status

Design phase - Do you have any comments or questions? We'd like to hear from you! Please feel free to contact the project representatives below.

Contact Information

Evan Limberatos, PE
WisDOT Design Project Manager
(262) 548-8797
evan.limberatos@dot.wi.gov

Chris Verhyen
WisDOT SE Region Communications
(262) 548-8757
chris.verhyen@dot.wi.gov

​​​