US 14 (Richland County line to Wisconsin River) - Sauk County

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

US 14 (Richland County line to Wisconsin River), Spring Green - Sauk County

Project overview

The purpose of this project is to prolong the service life of the existing pavement structure on US 14. The project will consist of removing 3.5 inches of asphaltic surface milling and replacing with 3.5 inches of hot mix asphalt (HMA) pavement.

Additional improvements include:

  • Replacing guardrail
  • Centerline rumble strips
  • New pavement markings
  • Two intersection improvements at WIS 23 and Rainbow Road
    • Traffic signals will be placed at the US 14/WIS 23 south intersection
    • A roundabout will be constructed at the US 14/Rainbow Road intersection
    • Curb ramps will be constructed at both intersections

Schedule

  • 2027 - Construction anticipated

Traffic impacts/detours

US 14 will remain open during construction through staging operations.

Status/phase

Design

Contact information

Greg Brecka, P.E.
WisDOT Project Manager
(608) 516-6524
gregory.brecka@dot.wi.gov

Hannah Punzel
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
TTY: 711