Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information
Project location
WIS 60 (US 61 to County W), Boscobel to Westport - Crawford and Richland counties
Project overview
This project involves a 4.08-mile-long stretch from US 61 to County W. The purpose of this project is to address the aged and deteriorating pavement with alligator and block cracking. The existing 3-inches of asphaltic pavement was placed in 1998 and has since received a sealcoat in 2007. The proposed improvement would include 3.0-inch milling and removal of asphaltic surface with a 3.5-inch overlay of new asphaltic surface. Additionally, the existing 3-foot paved shoulder would be extended to 5-feet to improve the safety of the roadway.
Schedule
- February 1, 2024 - Public Involvement Meeting
- 2029 - Construction anticipated
Traffic impacts/detours
WIS 60 will remain open during construction under flagging operations.
Status/phase
Design
Contact information
Paul Valenti, P.E.
WisDOT Project Manager
(608) 785-9063
paul.valenti@dot.wi.gov
Hannah Punzel
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
TTY: 711
Email:
swr.dtsd@dot.wi.gov