WIS 60 (US 61 to County W) - Crawford and Richland counties

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

WIS 60 (US 61 to County W), Boscobel to Westport - Crawford and Richland counties

Project overview

This project involves a 4.08-mile-long stretch from US 61 to County W. The purpose of this project is to address the aged and deteriorating pavement with alligator and block cracking. The existing 3-inches of asphaltic pavement was placed in 1998 and has since received a sealcoat in 2007. The proposed improvement would include 3.0-inch milling and removal of asphaltic surface with a 3.5-inch overlay of new asphaltic surface. Additionally, the existing 3-foot paved shoulder would be extended to 5-feet to improve the safety of the roadway.

Schedule

Traffic impacts/detours

WIS 60 will remain open during construction under flagging operations.

Status/phase

Design

Contact information

Paul Valenti, P.E.
WisDOT Project Manager
(608) 785-9063
paul.valenti@dot.wi.gov

Hannah Punzel​
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
TTY: 711
Email: swr.dtsd@dot.wi.gov