WIS 13 (Lake Street) between County D and County F, in the city of Phillips.

Overview

This project is a pavement replacement of WIS 13 (thick mill and overlay of existing asphalt). Other improvements would include spot replacement of curb and gutter, sidewalk, inlets, guardrail and curb ramps.

The project will also perform maintenance on the WIS 13 bridge over the Elk River, including replacement of the guardrail.

Traffic Impacts

WIS 13 will remain open to traffic during most of construction through the city of Phillips. Motorists can expect to encounter flagging operations and staged construction with single lane closures.

A temporary detour will be in place for deep excavations where roadway settlement is occurring and for storm sewer upgrades.

Pedestrians will be detoured to accommodate curb ramp/sidewalk construction.

Schedule

  • Local Officials Meeting #1: January 2020
  • Public Involvement Meeting: January 2020
  • Local Officials Meeting #2: May 2023
  • Final Plans: May 2024
  • Construction LET: September 2024
  • Construction currently scheduled: Summer/Fall 2025

Contacts

Stacy Hagenbucher, WisDOT Project Manager
Stacy.Hagenbucher@dot.wi.gov
(715) 365-5770

Rhinelander Office
510 N. Hanson Lake Road
Rhinelander, WI 54501
(715) 365-3490
WI Telecommunications Relay System (TTY): 711
Fax: (715) 365-5780
ncr.dtsd@dot.wi.gov

Wisconsin Rapids Office
1681 2nd Ave. S.
Wisconsin Rapids, WI 54495
(715) 421-8302
WI Telecommunications Relay System (TTY): 711
Fax: (715) 423-0334
ncr.dtsd@dot.wi.gov

Back to top button