US 63 (US 12 West to the Polk County line), town of Baldwin to towns of Cylon and Forest - St. Croix County

Location

US 63 from US 12 West north of the village of Baldwin to the Polk County line between the towns of Cylon and Forest in St. Croix County.

Overview

The existing pavement on this segment of US 63 is exhibiting signs of deterioration. To address this and other issues, the Wisconsin Department of Transportation plans to:

  • Remove a portion of the existing pavement and overlay the roadway with new asphalt pavement.
  • Widen the paved shoulders.
  • Add rumble strips.
  • Make bridge repairs.
  • Complete culvert work.
  • Clean ditches.
  • Replace guardrail at spot locations.

Schedule

Construction currently is scheduled for 2027, but work could occur as early as 2026 if funding becomes available.

Traffic Impacts

During construction, US 63 will remain open to traffic for most of the work, but motorists will encounter:

  • Single-lane closures
  • A short-term detour during work on a deep culvert.
    • Detour route: County E, County T and County G.

Project Documents

For more information on the proposed project, review the following:

Contacts

Jessica Doud
WisDOT Northwest Region Project Manager
(715) 577-2963
jessica.doud@dot.wi.gov

Tyler Rongstad
WisDOT Northwest Region Project Supervisor
(715) 461-0372
tyler.rongstad@dot.wi.gov

Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
nwr.dtsd@dot.wi.gov