Location
The project begins at County D in Owen and extends east to WIS 13 in Abbotsford.
Overview
The pavement on this segment of WIS 29 is showing signs of deterioration. To address this and other issues, the Wisconsin Department of Transportation is proposing:
- Repairing deteriorated sections of concrete pavement.
- Placing 3.75 inches of asphalt pavement over the roadway.
- Cleaning ditches and culverts.
- Replacing guardrail.
- Repairing the decks on the east- and westbound WIS 29 bridges over County D and the railroad tracks to the east and placing a thin bonded polymer overlay over them.
- Repairing the deteriorated sections of concrete pavement on the ramps at the WIS 29 interchanges at Cardinal Avenue, County E and Hi Line Avenue and placing 2.75 inches of asphalt pavement over them.
Schedule
Construction currently is scheduled for 2026.
Traffic Impacts
During construction, WIS 29 will remain open to traffic, but motorists might encounter:
- Single-lane closures and a speed limit reduction on WIS 29.
- Closure of the Cardinal Avenue and County E interchange ramps for approximately two weeks.
- Flagging to direct ramp traffic at the partial interchange at Hi Line Avenue.
Project Documents
Contacts
Zach VanOstrand
WisDOT Northwest Region Consultant Project Manager
(952) 456-6707
zach.vanostrand@peservicesmn.com
Nicole Passuello
WisDOT Northwest Region Project Supervisor
(715) 833-5572
nicole.passuello@dot.wi.gov
Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
WI Telecommunications Relay System (TTY): 711
nwr.dtsd@dot.wi.gov