WIS 130 bridges, Lone Rock

Design Build-Program | Information for Industry | Design-Build Projects | Sign up for Updates

This project replaced three existing bridges across the Wisconsin River with two new bridges.

  • Request For Proposals (RFP) (February 4, 2022)
  • Best Value Score Results (June 3, 2022)
      • The Highest Adjusted Score is the Best Value Proposal and the project will be awarded to the associated design-builder.
      Design-Builder Technical Proposal Score Cost Proposal Amount Amount Exceeding Lowest Cost Proposal Percent Exceeding Lowest Cost Proposal Price Score Adjusted Score
      Kramer North America31.92$36,937,137N/AN/A6091.92
      Ames Construction27.3$46,226,000$9,288,86325.1%44.9172.21

    Car driving over the WIS 130 bridge in Lone Rock. WIS 130 bridge over the WIsconsin bridge
    Completed WIS 130 design-build project. The project was finished in 2024.