WIS 44, WIS 73 North to Grand River Bridge, Green Lake County

Location

WIS 44, WIS 73 North to Grand River Bridge, Green Lake County

Project Overview

WisDOT is proposing to improve 3.8 miles of WIS 44 between WIS 73 north and the Grand River Bridge in the town of Manchester and city of Markesan, Green Lake County. Improvements are needed along WIS 44 to address deteriorating pavement, outdated guardrail systems, inadequate bicycle and pedestrian accommodations, and drainage features that are nearing the end of their service life. Several intersections and culvert locations also have steep slopes, erosion issues, or turning-radius limitations that create safety and maintenance concerns.

The purpose of the project is to address the existing roadway and guardrail deficiencies, improve drainage system deficiencies, and improve pedestrian and bicycle facilities.

Traffic Impacts

WIS 44 would remain open to traffic using temporary lane closures controlled by flaggers for the majority of construction. Access to local businesses and residences would be maintained during construction. Brief interruptions in access may occur temporarily at driveways. Owners will be notified prior to driveway closures. Temporary pedestrian curb ramps will be installed to maintain pedestrian access to the sidewalk during construction.

A short-term duration detour is anticipated during culvert pipe replacements and during the box culvert removal and replacement with a culvert pipe. Access to businesses and residences would be maintained. The proposed detour route for phase 1 and phase 2 will utilize WIS 73 and County H.

Real Estate

Small areas of temporary easements are anticipated to complete curb ramp replacements and grading work. Permanent right-of-way acquisition (FEE) is also anticipated at select locations. Any impacted property owners would be contacted directly during the design process.

Schedule

  • Local officials meeting: January 2026
  • Public involvement Letter: January 2026 to February 2026
  • Environmental document: April 2026
  • Final plans: May 2028
  • Construction currently scheduled for 2029

Public Involvement

A public involvement period is being held. Please review the information below and provide comment before Feb. 23, 2026.

Contact Us

Michael Jelinek, Project Manager
715-421-8098

Rhinelander Office
510 Hanson Lake Rd.
Rhinelander, WI 54501
(715) 365-3490
WI Telecommunications Relay System (TTY): 711
Fax: (715) 365-5780

Wisconsin Rapids Office
1681 2nd Ave. S.
Wisconsin Rapids, WI 54495
(715) 421-8302
WI Telecommunications Relay System (TTY): 711
Fax: (715) 423-0334