US 151 - Fond du Lac County

The Wisconsin Department of Transportation (WisDOT) is developing plans for proposed improvements on 13 miles of US 151 in Fond du Lac County. The purpose of this website is to provide information regarding the proposed improvements, describe the potential impacts it would have on the community, and offer an opportunity for public comment.

Project location 

US 151 from the South County Line in Waupun to Townline Road near Fond du Lac in Fond du Lac County.

​Project purpose and need

The proposed work aims to address the pavement, which is showing signs of distress and deterioration. This project is needed to extend the service life and improve the driving surface. In addition, the work will improve drainage along the corridor, replace the aging guardrail, and help mitigate snow drifting onto the highway.

​Anticipated benefits

Upon completion, the project will provide motorists with a smoother riding surface resulting in less wear on vehicles, while extending the life of pavement and reducing future maintenance costs. Further benefits include improving drainage throughout the corridor and improving the safety of drivers by installing living snow fences and updating guardrail systems.

​Proposed improvements

This is a perpetuation-level project. Proposed improvements include: 

  • Concrete repair and replacement of failing joints and slabs

  • Replace asphalt shoulders

  • Concrete pavement repair and asphalt mill and overlay at ramps to US 151

  • Adding an offset right turn lane at US 151 and County TC

  • Ditch Cleaning and grading at:

    • Median and northbound side from County Y overpass south to Seven Mile Creek bridge

    • Median and southbound side from mile marker 156 to mile marker 155

    • Northbound side from Dehring Road to Wolf Road

  • Culvert and endwall cleaning and repairs

  • Beamguard replacements on mainline and ramps

  • Replace three guardrail end terminals designed to redirect errant vehicles away from hazards

  • Living snow fences at specific locations

Living Snow Fence proposed locations:

  • Northbound on-ramp from Fond du Lac St. to US 151

  • Northbound side from County AS to Wolf Road

  • Southbound side from County AS to Dehring Road

  • Intersection of US 151 and County TC

  • Intersection of US 151 and Schaefer Drive

  • Click here to learn more about living snow fences

Traffic impacts 

  • US 151 will remain OPEN to traffic during construction using single-lane and shoulder closures. 

  • Ramp work will be done using full closures and detours.

Proposed Schedule

Please see the project website for updates throughout the design process.

  • Environmental document Completed: Summer 2024

  • Final Design Completed: August 2026

  • Construction currently scheduled in 2027

Real estate

No real estate purchases are anticipated at this time.

Business Resource: WisDOT’s In This Together program

WisDOT recognizes businesses located in work zones or impacted by detour routes have special needs. WisDOT's In This Together program is offered to businesses, organizations, and community leaders as an idea source as they plan for road construction in their area. It includes promotional examples, case studies, and a specially designed Business Coordination Guide with information on:

  • Planning ahead

  • Staying informed

  • Keeping customers informed

  • Tips for businesses

WisDOT’s In This Together website is located at www.wisconsindot.gov/Together​. Note: Businesses impacted by highway closures and detours will have an opportunity for temporary business signage during construction. 

​Public input/comments

Your comments assist us in developing a project that will serve the needs of the traveling public

as well as the needs of the local community. Comments are welcomed and appreciated throughout the design process. Comments may be submitted via US Mail with a prepaid comment sheet, email, or by phone.

  • Download and fill out the public comment form (with prepaid mailer) and mail it to WisDOT. 

  • Email comments or questions to the contact listed below. 

  • Call the contact below.

Project contact

Ryan Erdmann, P.E. WisDOT Project Manager

Wisconsin Department of Transportation

944 Vanderperren Way

Green Bay, WI 54304

Phone: 920-492-3517