US 2/53 (53rd Avenue East to County C) - Douglas County

Please visit this project at WisDOT’s new Projects Hub site, and adjust bookmarks as needed. The site content below will be archived later this year.

Location

The project is on US 2/53 from 53rd Avenue East in the city of Superior to County C in the town of Amnicon, all in Douglas County.

Overview

The pavement and culverts carrying storm water on US 2/53 are showing signs of deterioration as is the pavement at Rest Area 23 along the eastbound lanes. To address these, the Wisconsin Department of Transportation is proposing the following:

  • On US 2/53 in both directions:
    • Repairing concrete pavement, including making concrete joint repairs and replacing concrete pavement panels
    • Milling existing asphalt shoulders and overlaying shoulders with new asphalt
    • Milling and overlaying side road connections and the WIS 13 ramps
    • Installing shoulder rumble strips and gravel shouldering
    • Replacing culvert pipes
    • Repairing roadway slopes or embankments that have been eroded
    • Repairing the box culvert at Bear Creek
    • Replacing the large signs along US 2/53
    • Replacing right-of-way fencing along portions of the project
    • Repairing or replacing guardrail
    • Updating pavement markings to current standards
  • At Rest Area 23:
    • Replacing existing exterior facility lighting
    • Upgrading and modernizing pedestrian curb ramps
    • Replacing select panels of sidewalk
    • Cleaning joints and cracks on the existing concrete pavement entrance and exit to the facility as well as perimeter parking lot
    • Repairing existing concrete pavement or replacing concrete pavement panels as necessary
    • Repairing curb and gutter in spot locations
    • Overlaying existing concrete pavement with asphalt at entrance and exit to the facility as well as perimeter parking lot
    • Razing the existing maintenance garage and constructing a new garage and garbage area.
    • Adding additional semi-truck parking by increasing size of existing parking
  • At the Superior Safety and Weight Enforcement Facility (SWEF):
    • Upgrading and modernizing pedestrian curb ramps
    • Refreshing pavement markings

Schedule

Construction currently is scheduled for 2028 and 2029.

Traffic Impacts

During construction:

  • US 2/53 will remain open to traffic; however, north- or southbound lanes may be closed, crossovers may occur, and traffic may be limited to one lane in each direction.
  • Delays should be expected when traveling the work zone, especially during commuting hours.
  • Rest Area 23 repairs may require temporary closure of the facility.

Project Documents

WisDOT is seeking public input on the proposed project. Please review the following:

Contacts

Nick Maki
WisDOT Northwest Region Project Leader
(715) 492-1449
nicholasd.maki@dot.wi.gov

Stephanie J. King
WisDOT Northwest Region Project Manager
(715) 392-7874
stephanie.king@dot.wi.gov

Matt Van Natta
WisDOT Northwest Region Project Supervisor
(715) 392-7966
matthew.vannatta@dot.wi.gov

Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Northwest Region, Superior office
1701 N. 4th St.
Superior, WI 54880
(715) 392-7925, (800) 590-1868
nwr.dtsd@dot.wi.gov

Back to top button