US 8 (Minnesota/Wisconsin state line to Glacier Drive) and WIS 35 (Summit Street to Maple Drive), St. Croix Falls - Polk County

Location

The project limits are US 8 from the Minnesota/Wisconsin state line in the city of St. Croix Falls east to Glacier Drive in the town of St. Croix Falls and WIS 35 from 450 feet north of Summit Street to 75 feet south of Maple Drive in the city of St. Croix Falls, all in Polk County.

Overview

The pavement on these segments of US 8 and WIS 35 have begun showing signs of deterioration. To address this and safety concerns for the US 8/WIS 87 intersection, the proposed project will:

  • Mill 1 inch to 1 ¾ inches of the existing asphalt and concrete pavement and overlay the roadway with new asphaltic pavement
  • Reconstruct the existing right-turn lane for westbound US 8 traffic at the WIS 87 intersection
  • Replace, clean or repair select culverts and storm sewer inlets
  • Replace the existing guardrail at the Interstate State Park Road overpass
  • Perform maintenance on two sedimentation ponds
  • Install new pavement markings and signage

Schedule

Construction is scheduled for 2029.

Traffic Impacts

US 8 and WIS 35 will remain open to traffic throughout construction using lane closures and staged construction. In addition, access to all properties in the work zone will be maintained.

Public Involvement

WisDOT is seeking public input on the proposed project through Friday, March 6, by:

Contacts

Mark Wilfert
WisDOT Southeast Region Project Manager
(262) 548-5936
mark.wilfert@dot.wi.gov

Josh Leveque
WisDOT Southeast Region Project Supervisor
(262) 548-8647
joshua.leveque@dot.wi.gov

Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Northwest Region, Superior Office
1701 N. 4th St.
Superior, WI 54880-1068
(715) 392-7925, (800) 590-1868
WI Telecommunications Relay System (TTY): 711
nwr.dtsd@dot.wi.gov

Back to top button