US 14 (WIS 80 to Bohmann Drive) - Richland County

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

US 14 (WIS 80 to Bohmann Drive), City of Richland Center - Richland County

Project overview

This project will replace the existing pavement along US 14. The existing pavement has failed joints, mid-panel and corner breaks, spalling and potholes. Repair is needed to maximize the service life. The existing curb ramps do not meet ADA standards. Additional improvements include:

  • Concrete joint repair and panel replacement where needed
  • Curb and gutter and inlet repair where needed
  • New monotube traffic signals will be installed at the US 14/ WIS 80 and US 14/ Sextonville Rd intersections
  • New curb ramps will be installed to meet Americans with Disabilities Act (ADA) standards

Schedule

  • March 23, 2023 - Public Involvement Meeting
  • 2028 - Construction anticipated but advance able to 2025 it funding is available

Traffic impacts/detours

Temporary crossovers are proposed for work east of the US 14/ WIS 80 intersection. Work west of the US 14/WIS 80 intersection will require a short term detour.

Status/phase

Design

Contact information

Brad Schultz, P.E.
WisDOT Project Manager
(608) 246-3241
brad.schultz@dot.wi.gov

Hannah Punzel
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
Email: swr.dtsd@dot.wi.gov