WIS 78 (US 14 to US 12), Black Earth to Sauk City

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

WIS 78 (US 14 to US 12), Black Earth to Sauk City - Dane County

Project overview

The purpose of this project is to improve WIS 78 between WIS 14 and US 12 in Dane County. The project begins at the intersection of US 14, near the village of Mazomanie, and extends north approximately 7.8 miles to US 12 near the village of Sauk City. The existing pavement is deteriorated with extensive cracking and rutting. Proposed roadway improvements include pavement resurfacing and upgrading guardrail to current standards. The pavement improvement will primarily consist of milling 2 inches of the asphalt pavement and replacing it with 2 inches of asphalt pavement. The pavement marking will be replaced and centerline and shoulder rumble strips will be installed in some locations as a safety design treatment.

Schedule

Past (prior to today)

  • Spring/Summer 2019 - Survey

Current (this year)

  • Fall 2019 - Local Officials Meeting (LOM) and Public Involvement Meeting (PIM)
  • Fall/Winter 2019 - Complete Environmental Document

Future (next year and beyond)

  • 2020 - Finalize Project Plans
  • 2022 - Anticipated construction

Traffic impacts/detours

WIS 78 will be open to traffic during construction. The work will take place with a lane closure using a flagging operation.

Status/phase

Design

Contact information

Amy Coughlin, WisDOT Project Manager
(608) 245-5358
amy.coughlin@dot.wi.gov

Michael Bie, WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email: swr.dtsd@dot.wi.gov