The bridge carries WIS 64 over US 53 in the Chippewa County town of Bloomer.
Overview
Built in 1971, the bridge is showing signs of deterioration. To address this, the Wisconsin Department of Transportation plans to:
- Replace the deck.
- Replace the asphalt approach pavement on both sides of the structure.
- Complete concrete surface repairs to bridge abutments.
- Clean and paint bridge bearings.
- Complete spot painting of girder ends.
- Replace guardrail and surface drains.
- Place new pavement markings.
Schedule
Construction currently is scheduled for 2029.
Traffic Impacts
During construction:
- WIS 64 will remain open to a single lane of traffic controlled by temporary traffic signals.
- Off-peak single-lane closures will be used on US 53 as necessary, and full closures might be required on US 53 for the deck removal.
- If US 53 is closed, traffic will be routed around construction via the US 53/WIS 64 interchange on- and off-ramps.
Public Involvement
WisDOT is seeking public input on the proposed project through May 17, 2024, by:
- Email:
- Mail: Wisconsin Department of Transportation
718 W. Clairemont Ave.
Eau Claire, WI 54701
Attn.: Daniel Rambo
- Comment form
Contacts
Daniel Rambo
WisDOT Northwest Region Project Manager
(715) 514-7255
daniel.rambo@dot.wi.gov
Nicole Passuello
WisDOT Northwest Region Project Supervisor
(715) 833-5572
nicole.passuello@dot.wi.gov
Christena T. O’Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov
Wisconsin Department of Transportation
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
nwr.dtsd@dot.wi.gov