WIS 32 Resurfacing - Racine County

Project Location

WIS 32 - from approximately 4 Mile Road to County Line Road - village of Caledonia

  • View overview map
    • This resurfacing project excludes the recently reconstructed segment between 5 Mile Road and 6 Mile Road / WIS 31.

Improvements

WisDOT is proposing to resurface three miles of WIS 32. Planned improvements include:

  • Mill four inches of existing pavement – repave with four inches of asphaltic pavement
  • Pave five-foot shoulders
  • Re-dress gravel shoulder areas
  • Update curb ramps at MRK Trail (near Middle Road and WIS 32 intersection)
  • Install monotube signals at Middle Road and WIS 32
  • Replacement of culvert pipes and inlets on the south end of the project

Schedule

Construction is currently scheduled for 2026.

Traffic Impacts

Traffic control in the 4-lane area (2-lanes in each direction) will be through the use of lane closures. In the 2-lane area, traffic control will be through the use of a flagging operation. Temporary driveway closures will be needed during milling and paving operations. The contractor will be required to give advanced notice. Most closures will be short term (meaning a few hours).

Public Involvement Meeting

WisDOT will be hosting an open-house public involvement meeting on Thursday, October 19, 2023. This meeting will allow members of the community to provide WisDOT with feedback regarding the proposed improvements. Meeting details:

Caledonia Village Hall (5043 Chester Lane, Racine, WI 53402)
Thursday, Oct. 19. 2023
4:00PM - 6:00PM

Contacts

Do you have any comments or questions? We'd like to hear from you! Please feel free to reach out to the project representatives listed below.

Justin Suydam, P.E., WisDOT Project Manager
(262) 548-8745
Justin.Suydam@dot.wi.gov

Dan Sellers, WisDOT Communications
(262) 548-6702
Daniel.Sellers@dot.wi.gov