WIS 32 Resurfacing - Racine County

​Project ​Location

WIS 32 - from approximately 4 Mile Road to County Line Road - village of Caledonia

  • View overview map
    • This resurfacing project excludes the recently reconstructed segment between 5 Mile Road and 6 Mile Road / WIS 31.

Improvements

​WisDOT is proposing to resurface three miles of WIS 32. Planned improvements include:

  • ​​Mill four inches of existing pavement – repave with four inches of asphaltic pavement
  • Pave five-foot shoulders
  • Re-dress gravel shoulder areas
  • Update curb ramps at Martin Luther King Trail – Middle Road and WIS 32
  • Install monotube signals at Middle Road and WIS 32
  • Replacement of culvert pipes and inlets on the south end of the project

Schedule

​Construction is currently scheduled for 2026.

Traffic Impacts

Traffic control in the 4-lane area (2-lanes in each direction) will be through the use of lane closures. In the 2-lane area, traffic control will be through the use of a flagging operation. Temporary driveway closures will be needed during milling and paving operations. The contractor will be required to give advanced notice. Most closures will be short term (meaning a few hours).

Contacts

Do you have any comments or questions? We'd like to hear from you! Please feel free to reach out to the project representatives listed below.​​​

Justin Suydam, P.E., WisDOT Project Manager
(262) 548-8745

Dan Sellers, WisDOT Communications
(262) 548-6702