Stoughton (Spring Road to Roby Road)

Project overview | Public Involvement | Schedule | Exhibits | Contact information

​​Overview

This section between Stoughton and McFarla​nd is divided​ between three stages.

US 51 from Spring Road to Fifth Street in the city of Stoughton and town of Dun​kirk. Improvements include:

  • Reconstruct the existing 2-lane urban section and provide improved pedestrian accommodations
  • Provide a bicycle lane in both directions on US 51

US 51 from Fifth Street to Harrison Street in the city of Stoughton. Improvements include:

  • Reconstruct the existing 2 and 4-lane urban sections
  • Provide improved pedestrian accommodations
  • Update pavement markings at the Fourth Street intersection to provide a dedicated northbound left-turn lane
  • Provide bike routes on numerous parallel streets

US 51 from Harrison Street to Roby Road in the city of Stoughton and the town of Rutland. Improvements include:

  • Reconstruct the existing 4-lane urban section between Harrison Street and Hoel​ Avenue
  • Expand the existing 2-lane rural section between Jackson Street and Roby Road to a 4-lane urban section
  • Provide ​a 10-foot wide sidewalk on both sides of US 51 between Jackson Street and Roby Road

Public Involvement​

​Fifth Street to Roby Road

Spring Road to Fifth Street

Schedule

Note: These dates are subject to change based on funding availability.

Spring Road to Fifth Street

  • Construction scheduled for 2025

Fifth Street to Harrison Street

  • Construction scheduled for 2029, but advanceable to 2027

Harrison Street to Roby Road​

  • Construction scheduled for 2026

Exhibits

Contact information

David Schmidt, P.E.
WisDOT Project Manager
(608) 246-3867
david2.schmidt@dot.wi.gov​​