The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans for proposed improvements on the Main Street Bridge on US 45 over the Fox River in the city of Oshkosh, Winnebago County. The purpose of this website is to provide information regarding the proposed improvements, describe the potential impacts it would have on the community, and offer an opportunity for public comment.
Project location
The Main Street Bridge (B-70-56) over the Fox River and approaches, the city of Oshkosh, Winnebago County.
Project purpose and need
The structure is safe for vehicle and pedestrian crossing. The purpose of the project is to preserve the operation of the structural, mechanical, and electrical components of the US 45 Main Street Bridge.
The existing structure and its mechanical and electrical elements have received various repairs and maintenance over its lifespan, but the structure has become deficient due to varying levels of deterioration. Many of the elements are deteriorated or have exhausted their useful service life. These include structural, mechanical, hydraulic, and electrical components.
Anticipated Benefits
The following anticipated benefits are expected following the project’s completion:
- Decreased maintenance costs associated with the structure
- Improved operation of the movable span
- Extending the life of the existing structure by replacing deteriorated and worn-out components
Proposed improvements
Proposed improvements include:
- Rehabilitate existing electrical, mechanical, hydraulic, and structural components of the bascule span
- Minor repairs to the operator’s house and access platforms
- Scarification (removal) and overlay of the approach span concrete deck
- Removal and replacement of the steel grid deck on the movable span.
Traffic impacts
The bridge will be CLOSED during construction
-
Vehicle detour: The detour is shown as the solid orange line in the image below and utilizes 9th Avenue, Oregon Street, and Jackson Street.
-
Pedestrian detour: Uses sidewalks along 6th Avenue, Oregon Street, Jackson Street, Division Street, Pearl Avenue, and Main Street.
Schedule
The final design is expected in 2024. Construction will begin in the fall of 2025 and conclude in the spring of 2026
Real estate
No real estate is required for this project.
Business Resource: WisDOT’s In This Together program
WisDOT recognizes businesses located in work zones or impacted by detour routes have special needs. WisDOT's In This Together program is offered to businesses, organizations, and community leaders as an idea source as they plan for road construction in their area. It includes promotional examples, case studies, and a specially designed Business Coordination Guide with information on:
- Planning ahead
- Staying informed
- Keeping customers informed
- Tips for businesses
Temporary business signing
Please see the In This Together website for information on temporary business signing during closures and detours. Businesses impacted will have an opportunity for temporary business signage during construction.
Public input/comments
Your comments assist us in developing a project that will serve the needs of the traveling public
as well as the needs of the local community and are welcomed and appreciated throughout the design process.
Please submit comments to WisDOT using one of the following methods so that we receive them by the comment date to be considered during design.
- Fill out the comment form attached to the Main
Street Bridge Project Handout and mail it to WisDOT.
- Email comments or questions to the contact listed below.
- Call the contact below.
Project contact
Bill Bertrand, P.E., WisDOT Project Manager
Wisconsin Department of Transportation
944 Vanderperren Way
Green Bay, WI 54304
Phone: (920) 360-3124