Location
The project is at an unnamed drainageway on US 2 approximately 800 feet west of County D in the village of Poplar in Douglas County.
Overview
Two culverts - a 6-by-6-foot concrete box culvert under US 2 northwest of County D and a 5-foot metal culvert under the Tri-County Corridor Trail - are nearing the end of their service lives. The Wisconsin Department of Transportation is proposing to:
- Remove both structures, replacing them with a new metal culvert
Real Estate
Permanent and temporary easements have been acquired at the culvert ends to construct and maintain the project and can be seen:
Schedule
Construction currently is scheduled for 2027.
- Construction of this project (1180-05-74) will be tied to project (1180-00-81), which replaces the culvert that carries a branch of the Middle River under US 2 and the Tri-County Corridor Trail in Poplar.
- Construction of both projects is anticipated to take three months.
-
Project 1180-00-81: US 2, Branch Middle River Culvert, Poplar
Traffic and Trail Impacts
During construction, traffic will be maintained on US 2 with a short-term detour proposed during the culvert work directly under the US 2 travel lanes.
- US 2 traffic will be detoured on County F and WIS 13 for approximately two weeks.
- The property owners between the culverts will be required to use local routes to access US 2 during this time.
- The Tri-County Corridor Trail will be detoured for the duration of the project on Lackson, Bayfield, Center West Line and Elm roads.
-
Trail detour map
- Both detours will accommodate this project and the tied project.
- Local and emergency access will be maintained to adjacent properties.
Project Documents
-
Handout and comment form
- The comment period has ended; however, people who have questions about the proposed project can reach out to contacts below.
Contacts - Updated
Karen Richardson
WisDOT Northwest Region Consultant Project Manager
(608) 310-3282
Karen.Richardson@klengineering.com
Jeff Olson
WisDOT Northwest Region Project Supervisor
(715) 395-3032
jeffrey.olson@dot.wi.gov
Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov