The Wisconsin Department of Transportation (WisDOT) is proposing to resurface 4.6 miles of WIS 89 in Walworth County, from WIS 11 in the Town of Darian to County A in the Town of Richmond. The purpose of the proposed highway improvement project is to address the deteriorating pavement conditions, substandard and non-compliant guardrails, and culvert repairs and replacements.
Proposed Improvements include:
- Remove 3.5-inches of asphalt and resurface with 3.5-inches to 4-inches new asphalt
- Asphalt base patching
- Performing cross culvert repairs and replacements
- Guardrail will be replaced throughout the project limits
- Updated signing and pavement marking throughout the project limits
Traffic impacts
Potential impacts to traffic during construction are being evaluated.
Schedule
Construction is tentatively scheduled to begin in 2026.
Status
Design phase -
Do you have any comments or questions? We'd like to hear from you! Please feel free to contact the project representatives below.
Contact Information
Andrew Pinter, Project Manager
(262) 548-6438
andrew.pinter@dot.wi.gov
Chris Verhyen, Southeast Region Communications Manager
(262) 548-8757
chris.verhyen@dot.wi.gov