Project location
WIS 130 bridge over Wisconsin River, Lone Rock - Iowa/Richland/Sauk counties
Project overview
The Wisconsin Department of Transportation (WisDOT) is in the process of developing Design-Build documents for a proposed structure replacement on WIS 130 south of Lone Rock in Richland, Sauk and Iowa Counties. The southern project limits are approximately 1500 feet west and 200 feet east of the existing intersection of WIS 130 and WIS 133, and the northern project limit is approximately 250 feet north of Brace Memorial Park. The current proposal will replace the three existing structures with two new structures.
- Large aerial overview of the preferred alternative
- Aerial view and profile view of the preferred alternative
- Aerial view and profile view of WIS 133 and the southern project limits of the preferred alternative
- Aerial view of potential impacts at the northern project limits of the preferred alternative
- Concept for potential temporary impacts during construction of the preferred alternative
Interactive bridge exhibits
*Note users are encouraged to have a GPU and 16 GB of RAM to avoid unexpected computer shut down.
Low Resolution Views:
To navigate the low resolution exhibits, use the following mouse commands:
- Left Click and drag - rotates the view
- Right Click and drag - pans in the scene
- Middle Scroll Wheel – Zooms in and out
- Double Click- sets center of rotation and zooms into that point
High Resolution View: (Takes longer to load)
There are 2 modes of realistic model navigation in the web viewer: orbit and pan.
You can switch between the 2 modes by going to Menu → Navigation mode
Orbit mode navigation
- Left Click and drag - rotates the view
- Right Click and drag - zoom
- Middle Click and drag – pans in the scene
- Double Click - brings the clicked point to the center of the scene
Pan mode navigation
- Left Click and drag - pans in the scene
- Right Click and drag - zoom
- Middle Click and drag – rotates the view
- Double Click - brings the clicked point to the center of the scene
Advanced users:
This information will be provided for the duration of the project’s design and construction. Construction is anticipated to be completed during the 2025 construction season.
Schedule
- May 9, 2023 - Public Involvement Meeting
Lone Rock Community Hall
4:30 - 6:00 p.m.
- October 2022- Public Involvement Meeting
- October 2021 - Public Involvement Meeting
- October 2021 - Notice of Availability for Relocation
To view the upcoming schedule (Subject to change with weather and other project conditions) visit the
active construction website
- 2022-2024 - New bridge construction
- 2025 - Existing bridge removal
Traffic impacts/detours
The existing WIS 130 structures are anticipated to remain open during construction; however, some contractor operations may require the temporary closure of WIS 130. If so, the signed detour route will be as shown below.
- Detour for eastbound WIS 130:
- Use US 14/WIS 23
- Cross Wisconsin River in Spring Green
- Detour for westbound WIS 130:
- Use US 14, WIS 60, WIS 80, WIS 133
- Cross Wisconsin River in Muscoda
-
Detour Map
UPCOMING TRAFFIC IMPACTS:
- Periodic single lane closures with flagging operations on WIS 130 and WIS 133 for tree clearing operations and mobilizing equipment
- Please take caution and be aware of trucks entering and exiting the work zone, specifically on WIS 130 at the access points on to Long Island and the north finger
Status/phase
Design-Build
Contact information
Greg Brecka
WisDOT Project Manager
(608) 245-2671
gregory.brecka@dot.wi.gov
Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
Fax: (608) 785-9969
TTY: 711
Email:
swr.dtsd@dot.wi.gov