WisDOT's Design-Build Program is a collaborative contracting process that brings the engineering and construction industries together at the outset of a highway improvement project. Traditionally in Wisconsin, these processes have always been separated, where a designer plans the project and a construction company will then execute on those plans.WIS 125 6526-00-71 (March 4, 2022)

  • I-41 – Bluemound Dr., OUTAGAMIE, NORTHEAST
  • Removal of a multi-cell box culvert and replacement with a slab span structure on College Avenue in Appleton
  • Best Value Scoring Results
    • Proposals received: August 19, 2022
    • Results posted: September 9, 2022
    • The Highest Adjusted Score is the Best Value Proposal and the project will be awarded to the associated design-builder.
Design-BuilderTechnical Proposal ScoreCost Proposal Amount Amount Exceeding Lowest Proposal Percent Exceeding Lowest Cost Proposal Price ScoreAdjusted Score
Pheifer Bros30.51$3,806,945.86-N/A6090.61
KNA31.8$5,247,705.00$1,440,759.1437.85%37.2968.47

WIS 130 5770-01-02/72 (February 4, 2022)

  • WIS 23 – Lone Rock, Wisconsin River Crossing, RICHLAND, SOUTHWEST
  • Construction/replacement of 3 existing bridges across the Wisconsin River with 2 new bridges
  • Best Value Score Results (June 3, 2022)
    • Proposals received: May 12, 2022
    • Results posted: June 3, 2022
    • The Highest Adjusted Score is the Best Value Proposal and the project will be awarded to the associated design-builder.
Design-BuilderTechnical Proposal ScoreCost Proposal Amount Amount Exceeding Lowest Cost ProposalPercent Exceeding Lowest Cost Proposal Price Score Adjusted Score
Kramer North America31.92$36,937,137N/AN/A6091.92
Ames Construction27.3$46,226,000$9,288,86325.1%44.9172.21

US 45 1600-15-00/70 (October 4, 2021)

  • County C – Gollnow Rd, WAUPACA/SHAWANO, NORTH CENTRAL
  • Construction/replacement of 8 miles of pavement on US 45 west of Clintonville

Design-Build Contact Information:
Ben Thompson, benjamin.thompson@dot.wi.gov