Design-Build Projects

​​WisDOT's​ Design-Build Program is a collaborative contracting process that​​ brings the engineering and construction industries together at the outset of a highway improvement project. Traditionally in Wisconsin, these processes have always been separated, where a designer plans the project and a construction company will then execute on those plans.

WIS 125 6526-00-71 (March 4, 2022) 
  • I-41 – Bluemound Dr., OUTAGAMIE, NORTHEAST
  • Removal of a multi-cell box culvert and replacement with a slab span structure on College Avenue in Appleton
WIS 130 5770-01-02/72 ​(February 4, 2022)
  • WIS 23 – Lone Rock, Wisconsin River Crossing, RICHLAND, SOUTHWEST
  • Construction/replacement of 3 existing bridges across the Wisconsin River with 2 new bridges
  • Best Value Score Results​ (June 3​, 2022)​
US 45 1600-​15-00/70 (October 4, 2021)
  • County C – Gollnow Rd, WAUPACA/SHAWANO, NORTH CENTRAL
  • Construction/replacement of 8 miles of pavement on US 45 west of Clintonville

Design-Build Contact Information:
Ben Thompson, benjamin.thompson@dot.wi.gov